Since i-Twin information can be updated on a schedule, it would be beneficial to also be able to schedule the clash detection run. For example, models could be updated in the evening and the clash detection run after such that when the team returns in the morning there is a list waiting to be managed.
Hi Noel,
It might be better to have this separate from the connector, since each i-Model can have multiple connectors.
Hi, would this be an option in the connector page to enable clash detection to runs that are linked to that iModel?